Full Load hour is a measure of the degree of utilisation of a technical system. Full load hours refer to the time for which a plant would have to be operated at nominal power in order to convert the same amount of electrical work as the plant has actually converted within a defined period of time, during which breaks in operation or partial load operation can also occur. The figure usually refers to a period of one calendar year and is mainly applied to power plants.